The price of building a home and villa pool in Amol for standard reinforced concrete models varies from 8 to 16 million tomans per meter, and for prefabricated fiberglass pools, it costs between 120 and 350 million tomans for the complete structure package. This figure is determined depending on the physical characteristics of the project, including excavation depth, dimensions, grade of concrete used, brand of purification equipment and heating system. The main factor of price fluctuations in the Amol region is the difference in the level of underground water in the plains compared to the foothills, which fundamentally changes the volume of bracing, insulation and concreting.
Factors determining the cost of building a swimming pool in Amol climate
The cost of building a swimming pool in the city of Amol and its surrounding villages is not similar to the dry areas of the center of the country. Our workshop investigations in Novin Parse show that the local variables of Mazandaran region completely redefine the financial estimation formula.
Underground water level and drainage cost before concreting
In areas of Amol such as Dashtsar or the downstream parts of Haraz road, the surface water level rises sharply during the rainy season. If the drainage system and the French well are not dug before the implementation of the foundation, the osmotic pressure of the underground water will move the empty structure of the pool upwards and so-called float it. Equipping the workshop to contain water, constant pumping of sludge during excavation and pouring of concrete, except with high quality, alone can increase the cost of hardening between 15 and 25 percent.
The type of soil and the necessity of nailing or stabilizing the walls
The soil texture of Amol region in many villas is sandy or clay with very low shear stability. In the construction of outdoor villa pools, wall collapse during excavation is a serious risk for the villa structure and builders. This challenge requires the implementation of retaining walls, temporary mesh and protective shotcrete before the implementation of the main reinforcement, which will directly add to the overhead costs of the project.
Economic comparison of different types of swimming pool structures in Amol villas
Choosing the right material in the conditions of Mazandaran is of great economic importance; Because the mistake in choosing the primary structure will result in heavy restoration and destruction costs.
Reinforced concrete pool (double reinforcement and grade 400)
The most stable and, of course, the most expensive way to build a swimming pool in the north is the integrated reinforced concrete structure with metal formwork. In this method, concrete grade of at least 350 to 400 is used along with microsilica gel and water repellent lubricants. The cost of ribbed rebar, skilled rebar worker and ready-mixed concrete pump form the main part of the budget. In practice, it has been observed that concrete pools built with porcelain blocks and simple plaster in Amol's climate suffer from structural cracks and water leakage within 3 years at most, and are not worth investing in.
prefabricated fiberglass pools; Financial benefits and limitations
Resin multilayer fiberglass bowls are a fast option with installation time of less than 7 days. The initial cost of these models is clear and transparent, and on the other hand, they do not need re-insulation. Nevertheless, the cost of transportation and cranes in the mountain paths or narrow alleys of Amol estates (such as Chelaw and Imamzadeh Abdallah) can increase the final cost. In addition, in lands with reverse hydrostatic pressure of underground water, containment of these reservoirs requires heavy concrete infrastructure.
Costs of mechanical installations and engine room in wet weather
The beating heart of any villa swimming pool is its engine room, which must be equipped with rot-resistant parts due to the constant humidity in the north of Iran.
Piping system and anti-sediment material
Using regular poly or polyethylene pipes in burying under concrete is a grave mistake. In the basic projects of Novin Parse, high-pressure UPVC pipes and fittings with PN16 work category are exclusively used. The cost of these pipes is almost twice as much as conventional pipes, but they have lifetime resistance to chlorine compounds, concrete pressure, and shrinkage caused by water temperature changes.
Pump, filtration and heat exchanger
The water of the northern regions has variable amounts of solutes and hardness, which makes it necessary to choose a sand filter suitable for high-quality crystalline silica. The cost of a complete set of standard filtration is calculated according to the volume of the pool bowl. If the employer wants to use the pool for four seasons, the addition of a steel boiler or high-efficiency condensing packages along with a 316 all-steel heat exchanger will add between 50 and 120 million tomans to the cost of the facility.
Hidden costs and sealing in the construction of a villa pool
Some costs are not mentioned in the first stages of the price inquiry, but in the middle of the work, they put pressure on the employer's budget.
Insulation material and swimming pool ceramics
Two-stage polymer insulation based on modified cement and acrylic resin is the only guaranteed solution to prevent water penetration in the northern climate. The cost of waterproof adhesives, elastomeric insulators, and anti-freeze porcelain ceramics is much higher than ordinary ceramics, but it prevents the glaze from peeling in the snowy winters of Amol suburbs.
Costs of electricity consumption, earthing and life-saving switchboard
Pool facilities are no joke. Implementing a standard earth well with a resistance below 2 Ohms, 12V voltage conversion transformers for IP68 waterproof burial lights, and current life protection fuses is an essential part of safety that should not be ignored due to price reduction.